You are here: Home Library Southwest New Mexico Stakeholders Group (www.awsaplanning.com) Draft Technical Memorandum re: Gila River - April and May 2010 fieldwork (6/15/2010)

Draft Technical Memorandum re: Gila River - April and May 2010 fieldwork (6/15/2010)

Tetra Tech staff conducted field investigations along the Gila River, New Mexico from April 12th through May 5, 2010. The work was implemented in a manner consistent with the Gila River Study Plan (March 4, 2010) which describes the study being undertaken by the New Mexico Interstate Stream Commission (NMISC) and its consultants and collaborators. The field investigation included: (a) coordinating with the NMISC, collaborators and land owners to arrange access to monitoring locations along the Gila River; (b) drilling and constructing of monitoring piezometers near the river; (c) equipping the monitoring piezometers with pressure transducer / dataloggers in order to establish a long-term groundwater elevation monitoring network; (d) installing and equipping river stage gages at two monitoring locations; (e) completing a detailed site survey, including river cross-sections and piezometer and stage gage locations and elevations; and (f) associated field activities such as logging of subsurface geology, and piezometer development.

Draft Technical Memo_Gila Piezometers_TT_Gambora_20100615.pdf — PDF document, 39052 kB (39990101 bytes)

Filed under:
Search for Content

On the Portal:

Advanced Search